How Cleveland Power & Performance Professionally Ships Your Chassis

How Cleveland Power & Performance Professionally Ships Your Chassis

Here at Cleveland Power & Performance we routinely sell our rolling Chassis’ to customers out of state, and sometimes to international customers. Often, delivery of a chassis in our trailer is not an option, so we have to break them down to ship in crates. Today we will be going over the process showing in detail how we break our chassis’ down for shipping.


DSC03401 DSC03417


We start out with the complete chassis with all the accessories and harnesses in a box. After checking that every part of the chassis is there, we drain all the fluids from it.


DSC03424 DSC03429


Once all the fluids are drained from the chassis, we remove the lines and exhaust.


DSC03435 DSC03443


At this point we would then attach the engine to a engine hoist to hold the front steady.
Once the front end is attached we disconnect it from the torque tube. With the front end separated, we then remove the engine from the front suspension.


DSC03448 DSC03454 DSC03463


Once the front suspension and the engine are separated, we put the engine on a cart and strap it down.
We do this to assure we can move it around safely with out worry.


DSC03496 DSC03473


 

Then we will repeat the process with the rear suspension. The carrier will be unbolted from the transmission, and the wheels removed from the rear end.


DSC03479 DSC03500


 

Now the last part we do for disassembling the chassis is separating the torque tube and the transmission. Once that is done we inspect all the parts yet again to assure they are all good, and spin the wheels again to assure they are unbent.


DSC03498 DSC03505


At this point all the parts are placed upon carts and strapped down to assure their safety as we transport it to the Freight Department. We also open the box of accessories and harnesses to inspect them, to assure they are ready to be repackaged to ship.


DSC03585 DSC03559


Once the contents of the chassis box is placed onto our picturing area, we go over each part and inspect them yet again to make sure our customers receive everything they need for the chassis. As we inspect each part, we wrap them one at a time and repackage them into two boxes for shipping.


DSC03560 DSC03567


After all parts of the chassis are inspected, we sign off that the parts are good and we put “NO OIL” tags on the different sections. We do this to make sure the customer who receives the part knows with out a doubt that we have drained and inspected the whole chassis before it gets crated to ship. At this point we take all the sections and parts down to our freight department. The chassis is divided into two crates for safety reasons.


The first crate for the chassis starts with the front suspension being set unto a reinforced pallet. The front suspension is then banded to the pallet and the mid pipe and torque tube are placed into their positions.


DSC03617 DSC03624 DSC03628


At this point we add a mid level shelf to the crate. This allows us to place one of the chassis boxes and the mufflers on this crate.


DSC03655 DSC03659


When all the parts are were they need to be, we secure everything currently on the pallet with shrink wrap. Then we build up a second section of the crate and place the rear suspension on it. The rear suspension is also banded.


DSC03683 DSC03693


With everything for this crate secured, we go over the whole thing one more time before we finish the crate. Once the crate is complete, we finish it off with a few layers of shrink wrap and place the shipping tags on it.


DSC03718 DSC03739


With the first crate done we start on the second one. This one starts out as another reinforced pallet which we place the transmission and engine on. Both of these parts are then secured so they can not move. The engine is also bolted down to the pallet.


DSC03750 DSC03762


With the bottom of the crate complete, we move on to the next section. We build a small shelf for the second chassis box, before we move onto the top section of the crate. The last thing to be placed onto this crate would be the four ( 4 ) wheels placed on the top shelf of the crate.


DSC03764 DSC03771


Now as with the last crate we shrink wrap all the parts, and complete the crate. With the crate complete, we now shrink wrap the whole crate.


DSC03780 DSC03792


Now both crates are completed they are set out of the way by the freight door to await pick up.
We make sure all the proper labels are placed upon them, and that all the shipping information is correct for the chassis.


DSC03797 DSC03799


Now the final step in the whole process is when we finally load the chassis crates onto the freight truck.
At this point the chassis is on its way to its new owner, all safe and sound.


DSC03819 DSC03820


If you need to ship your chassis internationally, we fully crate and enclose them with plywood.


IMG_20150424_142216097 IMG_20150423_103302795


This is how we break down and crate a whole chassis. We make sure to inspect it all, along the way, to assure that every part of the chassis reaches the customer in full working order. As always, feel free to email or call us with any questions at power@clevelandpap.com and 866-236-5031.

Thanks for reading!